These 30 federal grant and contract awards total $1,241,270,086 in obligations, all civilian with zero defense-related records, and the period (October 15, 2026, a single day) yields an average signal strength of only 3.0/10.

The dominant themes are NASA and JPL space science R&D (roughly a dozen awards, many sole-source cost-plus to nonprofit Caltech), civilian IT and cybersecurity services at DOT, DHS, DOJ, SSA and VA, and VA/GSA construction. The largest award, Caltech's $112.3M NASA SKYFALL delivery order, goes to a non-investable nonprofit, so the most investable exposure lies in mid-size publicly relevant parents such as Peraton (Veritas Capital), SAIC, General Dynamics IT, ManTech (via Unison Software), and Deloitte, whose awards are individually modest. The clearest near-term watch item is Blue Origin's $99.6M obligation against a $5.0B NASA launch-services ceiling, where only about 2% is currently obligated; incremental funding there is the highest-conviction upside catalyst. Key risks include heavy subaward pass-through (SAIC's 82 subawards exceeding its own prime obligation, Peraton's $47.2M across four subawards) and several stale or unverified records (ECS Federal's 2016-era end date, DPR Construction's expired 2020 contract still showing $0 outlays).

Materiality, sentiment, and priority are scored by Gunpowder’s analysis pipeline. How we score filings →

Tracking the trend? Catch up on the prior High-Value Federal Grants ($5M+) digest from October 14, 2026.

Investment Signals (14)

  • Blue Origin NASA launch-services ceiling: $99.6M obligated against $5.0B ceiling (MEDIUM)
    ▲

    Blue Origin's firm-fixed-price VADR delivery order runs through 2032-01-27 with only about 2% of the $5.0B base-plus-options ceiling obligated and $18.5M outlayed. Incremental obligations or option exercises would be a material revenue catalyst for the company's space launch franchise.

  • Peraton Inc. wins FBI IT security BPA call order with $166.7M potential ceiling (MEDIUM)
    ▲

    Peraton received a $19.9M labor-hours BPA call order from the FBI for ISSO/ISSE security support under a competed SAP, with a base-plus-options value of $166.7M through 2032. The award reinforces Peraton's position in DOJ cybersecurity work, though it is a single call order with $0 outlays so far.

  • General Dynamics IT FAA FMDS modernization award (MEDIUM)
    ▲

    General Dynamics Information Technology received a $22.3M cost-plus-fixed-fee delivery order from the FAA to implement the new FMDS system replacing legacy TFMS, a modernization program with multi-year runway. The award is open-competition and low pricing risk, though it is small relative to the parent's total revenue.

  • Science Applications International (SAIC) FHWA infrastructure task order (MEDIUM)
    ▲

    SAIC received a $76.6M FHWA IT infrastructure task order with a base-plus-options ceiling of $116.6M through 2027, and $64.4M already outlayed. Heavy subawarding ($41.8M across 13 subcontracts) limits SAIC's retained economics, so the bullish read is tempered.

  • SAIC subaward total exceeds prime obligation on FHWA EITSS order (LOW)
    ▲

    The 2021 FHWA EITSS end-user support delivery order shows 82 subawards totaling $32.8M against a $32.2M prime obligation, a discrepancy the data does not explain. Unexplained subaward-to-prime mismatches warrant verification before attributing margin to SAIC.

  • ECS Federal EPA MDSS contract appears aged with minimal outlays (LOW)
    ▲

    ECS Federal (parent ASGN) holds a $68.6M EPA desktop services delivery order with only $635,018 (0.9%) outlayed and a 2016-2017 end date, suggesting stale status. Current revenue relevance to ASGN cannot be established from this record.

  • Peraton HHS/CMS delivery order: 80% subaward pass-through (MEDIUM)
    ▲

    Peraton's $59.0M CMS Medicare enrollment delivery order passes $47.2M (roughly 80%) to four subawards, meaning the prime retains a small share of the economics. Option exercise on the $100.7M ceiling remains unconfirmed.

  • Deloitte Consulting GSA administrative consulting delivery order (LOW)
    ▲

    Deloitte Consulting LLP received a $50.1M GSA FAS cost-plus delivery order running through 2027, with $20.3M of ceiling unobligated. Deloitte is a private partnership, so the investable read-through is limited to the consulting sector.

  • Caltech NASA JPL awards: $112.3M SKYFALL and multiple sole-source research delivery orders to non-investable nonprofit (HIGH)
    ▲

    Caltech holds at least six NASA/JPL delivery orders in this set (SKYFALL $112.3M, Rosalind Franklin $95.1M, JUICE RIME $22.3M, and others), but as a nonprofit it has no public equity exposure. These awards signal NASA science funding stability yet provide no direct investable catalyst.

  • DHS HSIN modernization and VA EHRM work carry high pricing risk (MEDIUM)
    ▲

    The BRIDGEPHASE DHS time-and-materials HSIN order ($14.3M) and MDM Construction VA EHRM infrastructure firm-fixed-price contract ($13.8M) are both flagged high pricing risk, with MDM at $0 outlays and BRIDGEPHASE at roughly 58% outlayed. Both recipients appear privately held, limiting investable read-through.

  • ManTech-owned Unison Software Treasury PRISM license and maintenance (MEDIUM)
    ▲

    Unison Software, a ManTech subsidiary, holds a $36.0M firm-fixed-price Treasury Fiscal Service delivery order for PRISM contract-writing software through 2027, with 62% already outlayed. The award is low pricing risk and recurring in nature, though ManTech's standalone financial contribution is not disclosed.

  • StoneX Financial U.S. Mint silver order with zero outlays and eight-day window (MEDIUM)
    ▲

    StoneX Financial, a foreign-owned firm, received a $32.8M U.S. Mint silver raw material order with a performance window ending 2026-10-21 and $0 outlayed. Execution risk is high in the short window, and StoneX is not a U.S. small business.

  • PCI Aviation 8(a) sole-source USMC KC-130 maintenance (MEDIUM)
    ▲

    PCI Aviation LLC, an 8(a) participant, holds a $19.7M sole-source GSA-placed USMC KC-130 maintenance contract with 75% already outlayed and a current end date of 2027-06-27. The policy-protected, nearly fully committed ceiling gives durable visibility for this small firm.

  • Blue Origin and Arrow Science launch-services ceilings far exceed obligations (MEDIUM)
    ▲

    Arrow Science and Technology's NASA launch-services delivery order has $36.0M obligated against a $5.0B ceiling with only $59K outlayed, and Impulse Space has $37.4M obligated against a $300M ceiling with $239K outlayed. Headline ceiling values should not be read as committed revenue.

Risk Flags (5)

  • Execution [MEDIUM RISK]
    ▼

    Multiple October 2026 awards show $0 outlays at award (StoneX Mint order, Peraton FBI BPA, GD IT FAA order, RTI CMS analysis), so near-term revenue recognition is unverified.

  • Concentration [MEDIUM RISK]
    ▼

    Subaward pass-through is heavy across the set: SAIC's FHWA order ($41.8M of $76.6M, 55%), Peraton's CMS order ($47.2M of $59.0M, 80%), Peraton's VA-adjacent work and Billy W. Jarrett's VA clinic ($15.0M of $22.1M, 68%) indicate prime-level margin is often diluted.

  • Budget [HIGH RISK]
    ▼

    Large unobligated ceilings (Blue Origin $5.0B, Arrow $5.0B, Impulse $300M, Peraton FBI $166.7M, FEDTEC SSA $117.3M) depend on future appropriations and option exercise; a continuing resolution or budget delay at the start of FY2027 would defer incremental funding.

  • Regulatory [MEDIUM RISK]
    ▼

    Set-aside eligibility and 8(a) participation status drive sole-source and protected awards (PCI Aviation 8(a), Index Analytics 8(a), Ironclad and MDM SDVOSB), so changes to size standards or program graduation would affect revenue durability.

  • Execution [MEDIUM RISK]
    ▼

    Data quality concerns: ECS Federal EPA order shows a 2016 end date with minimal outlays, DPR Construction NIH order shows a 2020 end date with $0 outlays, and the FBI PRISM-era records have stale status, so these may be closed or misreported and should not be counted as current revenue.

Opportunities (5)

  • ◆

    Blue Origin's NASA launch-services VADR relationship has $4.9B of unobligated ceiling, providing substantial organic growth if NASA issues incremental delivery orders.

  • ◆

    Peraton's FBI BPA and CMS delivery order together provide a multi-agency civilian IT and security growth path, with Peraton holding large ceilings ($166.7M FBI, $100.7M CMS) that could expand through options.

  • ◆

    Small disadvantaged and veteran-owned contractors (PCI Aviation 8(a), Index Analytics 8(a), Ironclad SDVOSB, MDM SDVOSB, Billy W. Jarrett SDVOSB, Burchick Small Business) collectively hold roughly $95M of set-aside awards in this set, indicating a durable protected pipeline.

  • ◆

    Caltech's sole-source NASA/JPL cost-plus delivery orders (SKYFALL, Rosalind Franklin, JUICE RIME) show durable, relationship-driven research funding, which implies stable JPL-linked spending but no direct equity exposure.

  • ◆

    No defense-related awards appear in this set (0/30), so defense expansion cannot be assessed from this period; the civilian-only mix suggests the digest should be paired with DoD award streams for a complete picture.

Sector Themes (4)

  • ◆

    Caltech and other JPL-linked recipients account for multiple large cost-plus sole-source awards, including SKYFALL $112.3M and Rosalind Franklin $95.1M, signaling stable NASA science R&D demand. Because the principal recipient is a nonprofit, the value flows to ecosystem contractors rather than listed equities.

  • ◆

    Awards from FAA, FHWA, DHS, FBI, and SSA total roughly $300M across IT modernization, cybersecurity and infrastructure services, led by SAIC ($76.6M), Peraton ($19.9M FBI, $59.0M CMS), and GD IT ($22.3M). This pattern indicates steady civilian IT spend rather than a single-agency surge.

  • ◆

    VA and GSA awards for clinics, hospitals and courthouses (Ironclad $22.4M, Billy W. Jarrett $22.1M, MDM $13.8M, Burchick $21.2M, DPR $22.3M) are dominated by small and veteran-owned set-asides, which limits large-cap contractor exposure.

  • ◆

    Subaward totals are large relative to prime obligations across several awards (SAIC FHWA 55%, Peraton CMS 80%, Billy W. Jarrett VA 68%), and SAIC's 2021 EITSS subawards exceed the prime obligation, signaling that margins may be shared with a broader subcontractor base.

Watch List (7)

  • 👁

    {"entity" => "Blue Origin", "reason" => "$99.6M obligated against a $5.0B NASA KSC VADR ceiling with only $18.5M outlayed; largest potential upside in the launch-services group.", "trigger" => "Incremental obligations or option exercises on the VADR delivery order; NASA FY2027 launch budget"}

  • 👁

    {"entity" => "Peraton Inc. (Veritas Capital)", "reason" => "Two sizable civilian awards (FBI BPA $19.9M of $166.7M ceiling; CMS $59.0M of $100.7M ceiling) with heavy subaward pass-through and $0 outlays on the FBI call order.", "trigger" => "FBI call-order option exercise in 2027; CMS option period decision through 2027-10"}

  • 👁

    {"entity" => "Science Applications International Corporation (SAIC)", "reason" => "$76.6M FHWA task order with $64.4M outlayed and $41.8M subawarded, plus unexplained 2021 EITSS subaward mismatch.", "trigger" => "FHWA incremental funding after 10/31/2024 and option exercises through 2027-06-30"}

  • 👁

    {"entity" => "General Dynamics Corp", "reason" => "$22.3M FAA FMDS modernization delivery order with $0 outlays at award; part of a broader air traffic systems replacement program.", "trigger" => "Outlay progression in FY2027 and any follow-on FMDS or TFMS replacement awards"}

  • 👁

    {"entity" => "StoneX Financial Ltd", "reason" => "$32.8M U.S. Mint silver order with $0 outlayed and an eight-day execution window ending 2026-10-21.", "trigger" => "U.S. Mint delivery and acceptance before 2026-10-21 and first payment recognition"}

  • 👁

    {"entity" => "ManTech International Corporation", "reason" => "Unison Software (ManTech subsidiary) holds $36.0M Treasury PRISM order with 62% outlayed, a recurring software licensing stream.", "trigger" => "Option exercise between $36.0M and $44.5M and 2027-08-31 end-date modifications"}

  • 👁

    {"entity" => "ASGN Incorporated", "reason" => "ECS Federal EPA MDSS order shows 2016-era end dates and only $635K outlayed; current revenue relevance is unclear.", "trigger" => "Verification of contract closeout status and any follow-on EPA desktop services solicitation"}

Get daily alerts with 14 investment signals, 5 risk alerts, 5 opportunities and full AI analysis of all 30 filings

$30/mo after a 14-day free trial — no credit card required. See pricing or explore intelligence streams.

More from: High-Value Federal Grants ($5M+)

🇺🇸 More from United States

View all →